active.requirements logo

PrinceLite ©

About

I have worked in business analysis for 10 years. I hold a BSc in Computer Science, a PhD in Software Engineering and a DipM (Marketing). The topic of my PhD was the definition of a requirements pattern based approach to improvements in I.T. project delivery which I finished in 2005 at the University of East Anglia.

I am an expert in UML use case modelling, and have published on that subject. Over the years I have become very interested in the reasons why certain projects fail where others succeed. I'm not a great believer in heavy top down methods that seem to cater for everything from construction to IT projects. They seem to be mostly honoured in their breach. PrinceLite is a reaction to a disjointed approach where project management and software engineering are treated as separate activities.

PrinceLite is a consequence of having worked on the following projects over the last 10 years.

Name Purpose Lifecycle Application
Strategic risk capabilitiy (SRC) To define a SRC prior to procurement Inception/ Elaboration Definition of a service capable of identifying risk targets for non-taxation compliance in the UK
Secure PostOffice Workflow system for patent application management Full lifecycle A integrated system for the protection of European intellectual property based on an account model in an ultra secure environment with complex workflow and permissions.
G-Wiz Internet enabled rate plan builder, yield management and booking engine Full lifecycle A best of breed solution to compete with the market leader for private, tour operator, travel agent and hotel clients.
LondonWorks Manage pan-London road works Requirements This application accepts a feed from all 33 London boroughs to represent works on their local networks and represent them graphically.
CB2 Replacement system Requirements/Analysis Project to replace legacy application. Relating traceable artefacts to test scenarios and scripts.
ESOL Venue Management Full lifecycle Internet project to allow foreign language centres to specify the location of assessments by candidate group in support of ‘just in time’ despatch.
OCR Educational Credit Framework Full lifecycle Adaptations to legacy system data structure to support new vision of qualifications being earned through the accumulation of credits.
TSD/Herald Document and contract management Procurement COTS (commercial off the shelf) procurement
PUSPERS Management of vehicle hire fleet Analysis and Design Comparison of structured methods with UML
PADHI Management of planning applications next to hazardous installations Post-implementation Reverse engineering
Bitesize Online booking and reservation systems for short educational courses Full lifecycle Procurement, Contract negotiation, Detailed analysis, Project management, Testing, Delivery
Signature Document management for brochure production and web publishing Full lifecycle Requirements representation and procurement of Documentum document management system.
Vision Booking Booking system with customer relationship management and CBT Full lifecycle Requirements representation, design, procurement negotiations, project management and testing management of third party suppliers.

When I'm not doing this, I enjoy sailing, speaking French and playing the clarinet. I don't like the television, but do like films.

 
Website by Accent Design Group